Skip to content
CNC Machine Base

Quality and inspection

How to Get a Machine Base You Can Accept

We do not inspect or certify your base, and we do not vouch for a shop. What we do is help you write the drawing and the RFQ so the checks, the standards and the documents are agreed before the order, when they cost nothing to add.

Certifications are stated by each fabricator, not by us. Ask for current copies of any you require.

Checkpoints

What to check, with what, and what you get

Inspection through the process tells you in time to correct; inspecting only the finished part tells you whether to accept or reject it. Each row is a request you can put in the RFQ. The standards are explained in the standards index.

StageCheckStandardRecord
MaterialMill or foundry certificate, grade and heat traceabilityEN 10025, EN 1561, EN 1563, EN 10204Certificate, type 3.1 if you name it
Welding procedure and weldersQualified procedure and current welder qualification for the process and positionISO 15614-1, ISO 9606-1, ISO 3834WPS and WPQR, welder certificates
After fabrication, before stress reliefDimensions and weld visual inspectionISO 13920, ISO 5817, ISO 17637Dimensional report, visual report
Weld NDTMagnetic particle on full-penetration welds, ultrasonic for volumetric checks in heavy sectionsISO 9934, ISO 17640, ISO 17635NDT report with scope and result
Stress reliefFurnace cycle or vibratory treatment completed as specifiedPer your drawingFurnace chart or treatment record
CastingsChemistry and mechanical test bar, ultrasonic testing of thick sections where specifiedEN 1561, EN 1563, ISO 17640Test report, NDT report
After rough and finish machiningFlatness, parallelism, squareness, hole position against the datum schemeISO 1101 or ASME Y14.5, ISO 2768Dimensional report, CMM or laser tracker where used
SurfaceBlast grade and paint system as specifiedISO 8501-1, ISO 12944Coating record
PackingMachined faces protected, lifting points marked, wood packaging treatedISPM 15Packing list, treatment mark

Three mistakes that cause most disputes

Where acceptance goes wrong

  • ISO 13920 missing. The fabricator assumes, and reasonably assumes a loose class. Put the class on the drawing, and the ISO 5817 level for the weld itself: they are different requirements.
  • No datum scheme. A shop without one picks a reasonable-looking surface and may pick differently from the designer. See GD&T for machine bases.
  • "Material certificates" without a type. Means whatever the shop decides. Ask for EN 10204 type 3.1 by name.

Read next

Questions

Do you inspect the base before it ships?

No. Inspection is between you and the fabricator. We tell you which matched shops can supply a dimensional report, weld inspection or a sea-worthy crate so you ask for it in the quote, and third-party inspection is easy to arrange: we can point you at firms that do it.

Are the fabricators certified?

Certifications are stated by each fabricator, not by us, and we do not verify or endorse them. If you need ISO 3834, welder certificates or anything else, put it in the RFQ and ask for current copies before you order.

Should I use third-party inspection?

On a first order with a new supplier several thousand kilometres away, an independent inspector at two or three points is inexpensive insurance against a multi-tonne mistake. On repeat work with a proven shop, the fabricator's own documented inspection is usually sufficient.

What is the difference between a hold point and a witness point?

At a hold point, work stops until the specified party has inspected and released it. At a witness point, the party is notified and may attend, but work proceeds if they do not. Use hold points sparingly and where a mistake would be irreversible.

Put it in the RFQ

The full RFQ form has fields for flatness, stress relief and documents. Reply within 24 business hours.