How a Machine Base Actually Gets Made

The construction comparison covers what a finished base is. This page covers how it got there: the process behind each construction, the standard governing each stage, and where the tradeoff actually bites.

The processes side by side

What a buyer prices a process on. Tooling and lead time decide most orders.
ProcessToolingFirst partBest volumeSize ceilingCost of a design change
Sand castingPattern, wood, resin or metalMonthsRepeat seriesFoundry pour weight and flask sizeHigh, pattern rework
Weld fabricationFixtures onlyWeeks, fastestOne-offs and small runsPractically none, set by furnace and machine toolLow, cut and re-weld
Filled weldmentFixtures onlyWeeks plus cureOne-offs and small runsShell size and fill handlingLow on the shell
Mineral castingMould, steel or GFRPMould build plus cureSeriesMould and mixing capacityVery high, the mould is the design
Natural graniteSaw and lapping plantWeeks to monthsOne-offs and small runsQuarry block sizeNot practical after cutting
Aluminium plate machiningFixtures onlyDays to weeksOne-offs to seriesPlate and machine envelopeLow, re-machine

Step by step

Grey cast iron / Ductile iron

Sand casting

  1. Pattern built in wood, resin or metal, sized to allow for shrinkage
  2. Mould formed around the pattern in green sand or a chemically bonded sand
  3. Molten iron poured and left to solidify and cool in the mould
  4. Shakeout, then fettling to remove gates, risers and flash
  5. Stress relief or ageing before any machining begins

Tradeoff: The pattern is the tooling. It is the slowest and most expensive route to a first part, and the cheapest per part once a pattern exists and volume repeats.

Standards: EN 1561, EN 1563, EN 10204

Read more · Read more

Welded steel / Filled weldment (shell)

Weld fabrication

  1. Plate and section cut to size, typically by laser, plasma or waterjet
  2. Fit-up and tack welding to a jig or fixture
  3. Welding to a qualified procedure (WPS), by welders qualified to ISO 9606-1
  4. Stress relief, thermal or vibratory, to release welding residual stress
  5. Machining of datum faces, way mounting surfaces and bolt patterns

Tradeoff: No tooling beyond fixtures, so it is the fastest route to a first part and the easiest to revise. Per-unit cost barely falls with volume.

Standards: ISO 13920, ISO 5817, ISO 3834, ISO 15614-1

Read more · Read more · Read more

Filled weldment

Filled weldment

  1. Steel shell built exactly as a plain weldment, above
  2. Cavity filled with a damping compound: mineral aggregate, polymer or concrete, depending on supplier
  3. Fill cured, in some formulations for several weeks
  4. Final machining of the shell’s reference faces

Tradeoff: The fill compound is proprietary to the supplier, not covered by a casting or concrete standard, so ask for its cured properties directly rather than assuming a grade.

Standards: ISO 13920, ISO 5817 (shell only)

Read more

Mineral cast

Mineral casting

  1. Mould built, usually in steel or GFRP, to the finished part geometry
  2. Steel inserts and levelling elements positioned in the mould at exact coordinates
  3. Graded mineral aggregate mixed with epoxy resin and cast cold into the mould
  4. Cured, typically over several days, then demoulded
  5. Only the insert faces receive machining; the cast surface itself is not cut

Tradeoff: There is no widely adopted grading standard for mineral cast, unlike iron or steel: the mix is the supplier’s own formulation. The mould is the design, so a late change is the most expensive of any construction here.

Read more

Welded steel / Grey cast iron / Ductile iron

Stress relief and ageing

  1. Thermal route: part heated slowly in a furnace, held at temperature, cooled slowly so residual stress relaxes
  2. Vibratory route: the structure is shaken near resonance so locked-in stress relieves, usable on parts too large for a furnace
  3. Natural ageing: castings left outdoors for months, the older route, still used on high-end bed castings
  4. On work that matters the sequence is weld, relieve, rough machine, relieve again, finish machine, because rough cutting releases stress the first cycle left in

Tradeoff: Thermal relief is the most reliable and the most limited by furnace size. Vibratory relief is faster and cheaper but harder to prove, so ask what record the shop keeps.

Read more

Natural granite

Natural granite production

  1. Block quarried and selected for even colour, grain and the absence of veins and cracks
  2. Block sawn to slab and rough ground to size
  3. Threaded inserts and reference holes drilled and bonded in with epoxy
  4. Working faces lapped to the specified grade, ISO 8512-2 for surface plates
  5. Flatness verified on a reference or with an autocollimator before release

Tradeoff: Almost all of the cost sits in lapping and handling. The stone cannot be adjusted after cutting, so inserts and holes must be right in the drawing.

Standards: ISO 8512-2

Read more

Welded steel / Grey cast iron / Ductile iron

Surface preparation and coating

  1. Blast clean to a stated grade: Sa 2.5 is the common requirement under ISO 8501-1
  2. Prime promptly, within hours, before rust forms on the bare blasted steel
  3. Apply the coat system by film thickness and environment, ISO 12944
  4. Mask or protect machined faces, and rustproof them separately for transit

Tradeoff: "Shot blasted and painted" means whatever the shop has time for. Naming the grade and the dry film thickness removes the argument.

Standards: ISO 8501-1, ISO 12944

Read more

Grey cast iron / Welded steel

Hand scraping

  1. Surface plate or master straightedge coated with a thin marking compound
  2. Part moved against it, the high spots mark, and the scraper removes them
  3. Cycle repeated until the bearing contact is even over the working surface
  4. Contact verified by points per inch, to the machine builder’s criterion

Tradeoff: Slow and skilled, so expensive. It gives a flat surface that holds oil and bears evenly, and is still specified for sliding ways on precision machines. Ground or milled and bonded linear guides need none of it.

Read more

All constructions

Finish machining and inspection

  1. Rough stock set up on its intended datums, per the drawing’s GD&T scheme
  2. Way mounting surfaces, bolt patterns and reference faces milled or ground
  3. In-process flatness and parallelism checked against the callouts
  4. Final inspection recorded on an inspection and test plan before release

Tradeoff: This stage is where a missing or ambiguous datum scheme costs the most: a fabricator without one will pick a reasonable-looking surface and may pick differently than the designer intended.

Standards: ISO 1101, ASME Y14.5, ISO 2768

Read more · Read more · Read more

Why the process matters as much as the material

Two grey iron bases from two foundries are not the same part if one skipped the ageing step before machining. The material standard tells you what the alloy is; it says nothing about whether the process that turned it into your part was followed. That is what the standards index and an inspection and test plan are for.

It is also why a quote that only names a material grade is an incomplete quote. Ask which of the steps above the shop actually performs in-house, and which it subcontracts.